engineering-management

Story time

Part A

1) Ensure you have a drink, a pen and some paper. 2) Think of a story you can tell the team – give 2 minutes to prep. 3) The story must be start and end within two minutes. 4) The story must contain a. a central character (mentioned by name at least 3 times) b. a random object c. a location d. a spurious fact 5) Begin the story when given the signal from the meeting facilitator / scrum master

Part B

1) Listen to the stories of your colleagues and write down the storyteller’s name and answer the following questions: a. Who was the central character? b. What was the random object? c. Where was the story set? d. What statement was incorrect or false?